A scorcher of a day “Setting Out” onsite on Bromley High Street
DMP undertake on hottest day of year of 2021 as temperatures hit 28.6C inspection of site on behalf of our client.
The property located on Bromley High Street, our team is to provide setting out drawings, for proposed new structural steel frame for three storey extension and mansard roof extension.
Following our newsfeed of 9th June 2020 DMP having secured various planning permissions during 2019/2020. Thus providing to our client in Summer 2020 a full set of construction and building regulation drawings. Works have commenced onsite and therefore a suite of drawings for setting out of the new structures has been requested.
The setting out a building is the process of transferring architectural proposals from architectural drawings. In particular, incorporating Structural Engineers drawings and in this case the steel fabricators drawings. The setting out drawings establishes the location points for site boundaries, foundations, columns, centre-lines of walls and other necessary structural parts.
The re-development of the former bank is to provide 4 no. 1 bedroom flats and 2 no. bedroom flats with self contained retail offering to the basement and ground floor.
Our experienced Architectural Technicians are liaising with our clients structural engineers and main contractor.
In addition, importantly DMP have acted on behalf of the client and agreed Party Wall Awards with five interested parties from adjoining properties.
Contact Us for Expert Advice
If you require any help or advice at any stage of your commercial or residential project, contact us and we can talk you thought it.
Furthermore, to learn more about how we think, read our interesting case studies and industry news.
