Scheme Development in the
Industrial Heart of Sittingbourne
DMP have been instructed on the initial stage of a project to undertake a detailed Measured Survey on the Industrial Estate in Sittingbourne.
The second stage shall be the preparation of planning drawings and submission of a full planning application to Swale Borough Council for an extension to an existing Parcel Distribution Centre. Sittingbourne.
